About design.alif@gmail.com

This author has not yet filled in any details.
So far design.alif@gmail.com has created 10 blog entries.

AMEA Power signs Memorandum of Understanding with National Electricity Company of Democratic the Republic of Congo

Dubai, United Arab Emirates; April 4, 2022: AMEA Power has signed of a memorandum of understanding for the realization of electrical infrastructure projects in the Democratic Republic of Congo (DRC).

The signing of this agreement, which took […]

AMEA Power signs Memorandum of Understanding with National Electricity Company of Democratic the Republic of Congo2023-02-13T10:55:58+00:00

Metbassta, Tunisia

AMEA Power is developing this 100MW Solar PV plant jointly with TBEA Xinjiang Sunoasis Co. on a BOO basis in Metbassta, Kairouan Governate, Tunisia which was awarded through a tender process.

Name […]
Metbassta, Tunisia2022-10-20T12:12:18+00:00

Amunet, Egypt

Located in Ras Ghareb, within the Red Sea Governorate, AMEA Power is developing through its subsidy, Amunet Wind Power Company (AWPC), a 500MW wind power project.  AMEA Power has signed power purchase agreements with the Egyptian […]

Amunet, Egypt2022-10-27T10:43:50+00:00

Abydos, Egypt

Located in Kom Ombo, within the Aswan Governorate, AMEA Power will build, own and operate a 500MW solar PV power plant through its subsidy Abydos Solar Power Company (ASPC). AMEA Power has signed power purchase agreements […]

Abydos, Egypt2022-10-27T11:54:25+00:00

Abour, Jordan

AMEA Power is a co-owner with Xenel in this greenfield 51.75MW Wind BOO Project in Tafila, Jordan awarded in the 1st Round Jordan FIT program.

Name of the Project Abour, Jordan
Capacity 51.75MW
Technology
Abour, Jordan2022-10-26T08:27:04+00:00

Al Husainiyah, Jordan

AMEA Power is the lead developer and majority shareholder in a greenfield 50MW Solar PV on a BOO basis in Ma’an, won under the Jordan 2nd Round FIT.

Name of the Project Al […]
Al Husainiyah, Jordan2022-10-26T08:59:13+00:00

Blitta, Togo

Fully developed by AMEA Power from inception to operation in less than 24 months, even during Covid. This 50MWp Solar PV IPP is the first utility-scale renewable project in Togo. AMEA Technical Services, a subsidiary of […]

Blitta, Togo2023-02-14T11:47:05+00:00